Date Difference Calculator

Days, weeks and months between two dates

Count both dates
Results update as you type
Difference
90 days
0 years, 2 months and 29 days
Weekdays vs weekend days
  • Weekdays65 d72%
  • Weekend days25 d28%
Total weeks
12 + 6d
Total months
2
Total hours
2,160
Weekdays
65
Weekend days
25
Start / end day
Sun → Sat
Weekdays: 65 dWeekend days: 25 d90 dDays
Weekdays65 d72.2%
Weekend days25 d27.8%

Understand the result

About the Date Difference Calculator

How do you count the days between two dates?

Counting days between dates matters more often than you might think: notice periods, interest on a deposit, loan due dates, visa stays, project deadlines and legal limitation periods all depend on it. The main question is whether to count both the start and end dates, which changes the answer by one day.

This date difference calculator shows the gap between any two dates in years, months and days, and as total days, weeks and working days (Monday to Friday), with an option to include the end date.

How this calculator works

The difference between two dates is reported two ways, because both are useful. The calendar difference — years, months and days — is what contracts and notice periods use. The total day count is what you need for interest, penalties and deadlines.

Weekday and weekend counts are produced by walking the range day by day, so public holidays aside, the figure is exact rather than an approximation based on dividing by seven.

Formula

Total days = end date − start date      (+1 when both days are counted)
Calendar difference = whole years, then whole months, then leftover days
Weekdays = days in range that are not Saturday or Sunday

Worked example

  1. From 1 April 2026 to 30 June 2026: 90 days between the dates, 91 if both are counted.
  2. That is 2 months and 29 days in calendar terms, with 65 weekdays.

Common uses

  • Notice periods and service length, where “both days inclusive” is the usual convention.
  • Interest calculations: banks usually count the actual number of days the money was deposited, excluding the day of deposit or of withdrawal.
  • Loan and bill due dates, and the grace period before a late fee applies.
  • Visa and travel limits, which are normally counted in calendar days including arrival and departure.
  • Project planning, where working days — excluding weekends and holidays — matter more than calendar days.

Assumptions & important notes

What this calculator assumes

  • Public holidays are not excluded — only Saturdays and Sundays are treated as non-working days.
  • If the end date is earlier than the start date, the two are swapped so the difference is never negative.

Frequently asked questions

Should I include both the start and end date?

For a notice period, leave application or hotel stay, usually yes. For interest calculations and deadlines, usually no. Use the toggle to switch between the two.

Why do the months and days not simply come from the total days?

Months have different lengths, so 90 days is not exactly three months. The calendar difference counts real months on the calendar, which is what agreements and legal documents mean.

How do I find the number of days between two dates in Excel?

Subtract the earlier date from the later one: =B1-A1, formatted as a number. Use =NETWORKDAYS(A1, B1) for working days, which counts both dates and skips weekends.

Does the calculator account for public holidays?

No. Working days exclude Saturdays and Sundays only. Public holidays vary by state and employer, so subtract them separately.

Next steps

Keep planning

PaiseWise runs entirely in your browser — the figures you enter are never sent anywhere. Results are estimates for planning only, not financial, tax or investment advice.